Maxwell Lake
Scope
Build Bridge while protecting environment
Summary
This project in Hinton consists of a 18m pedestrian bridge over the Maxwell Creek which drains into Maxwell Lake. The area around the bridge is an environmental park, home to many species of birds, and animals. Care of the environment was critical.
The area where the bridge is located is a marsh so installing the piles and bridge occurred in the winter when the mash was frozen.
Construction Value: $300,000
Span of bridge: 18m
Foundation: Screw piles with steel cap beams
Bridge deck: Timber
Loading: Pedestrians and emergency vehicle
Gravel pathway at bridge ends
What Our Clients Say
Absolutely the best services they did building repair were fast and professional i highly recommend sure seal contracting they support our community and the veterans of Calgary
Darcy N
This company is fast and efficient getting the job done the same week I called. Professional service and quality work. They were also under other quotes. I will use them again in the future.
Christine L
Attention to detail is unmatched by any company I've been with they train you and strive for their workers to be the best in the industry
Aaron H
Gallery | Maxwell Lake