Calgary Cancer Center

Project: Calgary Cancer Center
Start Date: May 1, 2021
End Date: August 22, 2021
General Contractor: PCL Construction
Location: Calgary
Site Name: CCC
Service Type(s):
Caulking, Sealant, Parking Slab Repair

Scope

Supply and install all caulking, sealants and parking slabs

Summary

The Calgary Cancer Center is over 1.3M square feet over 13 stories high and 5 levels below ground. The Center has over 3000 bathrooms and laboratory fixtures, 160 inpatient beds, 100 chemotherapy rooms and 12 Radiation Vaults. We were contacted to supply and install all caulking and sealants for:
  • Wall seams
  • Door frames
  • Elevator doorframes
  • Bathroom fixtures
  • Laboratory fixtures
  • Chemotherapy rooms radiation vaults
  • Inpatient rooms
  • Hallways & connectors
  • Food prep facility
  • Laundry, housekeeping, and administration offices,
  • Floor stations
  • Concrete slab crack repair
We were very proud to be a part of this much-needed facility for people and families suffering with this terrible disease.

What Our Clients Say