News

Wayne Bridge
Bridges

Wayne Bridge #11 Project

Wayne Bridge #10, in Drumheller has been replaced. We were requested to dismantle the current bridge and replace it with a nice new bridge.

Read More »
Fisher Bridge New
News

Fisher Bridge Complete

The Fisher Bridge replacement is now complete. We were requested to dismantle the current bridge and replace it with a nice new bridge. Read about our adventures in this post.

Read More »
VendorPM
News

VendorPM

Exciting news, Sure-Seal is now a member of VendorPM. VendorPM was started in 2020 with their first 1000 users growing their base users to Canada-wide in 2021. It is a centralized place for Property Managers and Vendors to work together. VendorPM is a cutting-edge software solution designed to simplify and enhance

Read More »
types of Expansion Joints Straight Run
Expansion Joints

9 Types of Expansion Joints

9 Types of Expansion Joints There are many types of expansion joints for your project. An expansion joint is a structural element that is designed to absorb thermal expansion or contraction in a building, bridge, or other structure. Expansion joints are used to prevent damage caused by expansion and contraction,

Read More »
Importance of firestopping
News

The Practice of Firestopping

The Practice of Firestopping The Practice of Firestopping is creating and maintaining fire-resistant barriers within buildings to contain and prevent the spread of fire and smoke. It is a crucial element of building safety and a critical aspect of building codes and regulations worldwide. The purpose of firestopping is to

Read More »
Fisher Bridge Original
Dams

Fisher Bridge Replacement Project

Fisher Bridge The latest Sure-Seal project is the replacement of the Fisher Bridge located on the Crowsnest river just east of Lundbreck Falls. Although the 80’ single-span pony truss bridge built in 1927 is in great condition it is the abutments on both sides have failed, as a result, the

Read More »